BPA-G1034
400 MW generation in Kittitas, WA · In queue since November 2023 · Proposed COD October 2028
400 MW
Capacity
1
Components
Wind
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-31
BPA-G1034 is a proposed 400 MW wind generation project located in Kittitas County, Washington. The project was entered into the Bonneville Power Administration (BPA) interconnection queue on November 21, 2023, with a proposed commercial operation date of October 31, 2028. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
The point of interconnection (POI) for the project is the Rocky Reach-Columbia No 1 230 kV line. The developer is listed as BPA. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
WA
County
Kittitas
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Rocky Reach-Columbia No 1 230 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.