Project BPA-G1035 — Project Summary

Queue ID
BPA-G1035
Capacity
400 MW
Technology
Solar
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1035

BPA-G1035BetaActiveSolarBPALBNL

400 MW generation in Douglas, WA · In queue since November 2023 · Proposed COD October 2028

400 MW

Capacity

1

Components

Solar

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

4y 11m

In Study38%
Queue EntryNov 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-10-28

About

BPA-G1035 is a proposed solar generation project located in Douglas County, Washington, with a total capacity of 400 MW. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 21, 2023, and a proposed commercial operation date of October 28, 2028. The point of interconnection is the Chief Joseph Substation at 230 kV.

The interconnection agreement (IA) status for BPA-G1035 is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Chief Joseph Substation at 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.