BPA-G1035
400 MW generation in Douglas, WA · In queue since November 2023 · Proposed COD October 2028
400 MW
Capacity
1
Components
Solar
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-10-28
BPA-G1035 is a proposed solar generation project located in Douglas County, Washington, with a total capacity of 400 MW. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 21, 2023, and a proposed commercial operation date of October 28, 2028. The point of interconnection is the Chief Joseph Substation at 230 kV.
The interconnection agreement (IA) status for BPA-G1035 is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
WA
County
Douglas
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Chief Joseph Substation at 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1035