42 MW hybrid in Lane, OR · In queue since November 2023 · Proposed COD December 2026
42 MW
Capacity
2
Components
Solar + Battery
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
BPA-G1044 is a proposed 42 MW hybrid solar and battery project located in Lane County, Oregon. The project, consisting of 21 MW of solar generation and 21 MW of battery storage, is interconnected to the Bonneville Power Administration (BPA) grid. It is located on the Cheshire-Alderwood 115kV transmission line approximately 2.75 miles west of Cheshire substation.
The project is currently listed as active in the BPA interconnection queue, with an entry date of November 22, 2023, and a proposed commercial operation date of December 31, 2026. The interconnection agreement (IA) status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OR
County
Lane
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
On the Cheshire-Alderwood 115kV transmission line approximately 2.75 miles west of Cheshire substation.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.