Project BPA-G1044 — Project Summary

Queue ID
BPA-G1044
Capacity
42 MW
Technology
Solar+Battery
Status
active
Location
Lane, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1044

BPA-G1044BetaActiveSolarBatteryBPALBNL

42 MW hybrid in Lane, OR · In queue since November 2023 · Proposed COD December 2026

42 MW

Capacity

2

Components

Solar + Battery

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 1m

In Study38%
Queue EntryNov 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

Technology
Solar21 MW · 50%
Battery21 MW · 50%
About

BPA-G1044 is a proposed 42 MW hybrid solar and battery project located in Lane County, Oregon. The project, consisting of 21 MW of solar generation and 21 MW of battery storage, is interconnected to the Bonneville Power Administration (BPA) grid. It is located on the Cheshire-Alderwood 115kV transmission line approximately 2.75 miles west of Cheshire substation.

The project is currently listed as active in the BPA interconnection queue, with an entry date of November 22, 2023, and a proposed commercial operation date of December 31, 2026. The interconnection agreement (IA) status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Lane

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

On the Cheshire-Alderwood 115kV transmission line approximately 2.75 miles west of Cheshire substation.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G1044