BPA-G1045
64 MW hybrid in Umatilla, OR · In queue since November 2023 · Proposed COD December 2026
64 MW
Capacity
2
Components
Solar + Battery
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
3y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
BPA-G1045 is a proposed 64 MW hybrid Solar+Battery project located in Umatilla County, Oregon. The project consists of 32 MW of solar generation and a 32 MW battery energy storage system. It is interconnected to the Bonneville Power Administration (BPA) grid at the Roundup Substation at 230 kV.
The project is listed in the BPA interconnection queue as of November 22, 2023, with a proposed commercial operation date of December 31, 2026. Its interconnection agreement (IA) status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Roundup Substation at 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1045