Project BPA-G1050 — Project Summary

Queue ID
BPA-G1050
Capacity
1300 MW
Technology
Solar+Battery
Status
active
Location
Deschutes, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1050

BPA-G1050BetaActiveSolarBatteryBPALBNL

1,300 MW hybrid in Deschutes, OR · In queue since November 2023 · Proposed COD December 2028

1,300 MW

Capacity

2

Components

Solar + Battery

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

5y 1m

In Study38%
Queue EntryNov 22, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Technology
Solar650 MW · 50%
Battery650 MW · 50%
About

BPA-G1050 is a proposed 1300 MW hybrid solar and battery project located in Deschutes County, Oregon. The development project consists of 650 MW of solar generation paired with 650 MW of battery storage. It is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 22, 2023, and a proposed commercial operation date of December 1, 2028.

The interconnection agreement (IA) for BPA-G1050 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the LaPine Substation at 230 kV. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Deschutes

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

LaPine Substation at 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.