BPA-G1056
650 MW storage in Deschutes, OR · In queue since November 2023 · Proposed COD November 2030
650 MW
Capacity
1
Components
Battery
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
7 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-11-01
BPA-G1056 is a proposed 650 MW battery storage project located in Deschutes County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 22, 2023. The proposed commercial operation date is November 1, 2030.
The interconnection agreement for BPA-G1056 is currently in progress, with the specific study type not specified. The point of interconnection is the La Pine Substation at 230 kV. The project is being developed within the BPA service area.
Generated from interconnection queue and public data sources
State
OR
County
Deschutes
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
La Pine Substation at 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.