BPA-G1064
15 MW storage in Umatilla, OR · In queue since April 2024 · Proposed COD January 2026
15 MW
Capacity
1
Components
Battery
2y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
1y 9m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-01-01
BPA-G1064 is a proposed 15 MW battery storage project located in Umatilla County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of April 16, 2024, and a proposed commercial operation date of January 1, 2026. The interconnection agreement status is listed as "In Progress (unknown study)".
The point of interconnection (POI) for BPA-G1064 is the UEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation. The project is sponsored by BPA.
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
UEC Westland to McNary 230 kV line that terminates in the 230 kV Bay 16 terminal of the McNary Substation.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.