BPA-G1065
1 MW generation in Linn, OR · In queue since April 2024 · Proposed COD September 2025
1 MW
Capacity
1
Components
Solar
2y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
1y 5m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-09-30
BPA-G1065 is a proposed solar generation project with a total capacity of 1 MW, located in Linn County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of April 22, 2024, and a proposed commercial operation date of September 30, 2025.
The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the BPA FEEDER: ALBANY L184, 12kV FEEDER to NETL BYPASS DISCONNECT (POLE SWITCH), with interconnection to occur on the NETL side of the bypass disconnect.
Generated from interconnection queue and public data sources
State
OR
County
Linn
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
BPA FEEDER: ALBANY L184, 12kV FEEDER to NETL BYPASS DISCONNECT (POLE SWITCH). INTERCONNECTION TO OCCUR ON THE NETL SIDE OF THE BYPASS DISCONNECT
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1065