Project BPA-G1066 — Project Summary

Queue ID
BPA-G1066
Capacity
0.4 MW
Technology
Solar
Status
active
Location
Marion, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1066

BPA-G1066BetaActiveSolarBPALBNL

0.4 MW generation in Marion, OR · In queue since April 2024 · Proposed COD June 2024

0.4 MW

Capacity

1

Components

Solar

2y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

2 months

Schedule

23 months past proposed COD

In Study38%
Queue EntryApr 23, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-06-01

About

BPA-G1066 is a proposed solar generation project located in Marion County, Oregon, with a total capacity of 0.4 MW. The project consists of a single 0.4 MW solar component. It is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of April 23, 2024. The proposed commercial operation date is June 1, 2024, and the interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Salem Alumina 115 kV line.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Marion

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Salem Alumina 115 kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G1066