Project BPA-G1068 — Project Summary

Queue ID
BPA-G1068
Capacity
1 MW
Technology
Solar
Status
active
Location
Clark, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1068

BPA-G1068BetaActiveSolarBPALBNL

1 MW generation in Clark, WA · In queue since June 2024 · Proposed COD November 2024

1 MW

Capacity

1

Components

Solar

1y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

5 months

Schedule

18 months past proposed COD

In Study38%
Queue EntryJun 21, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-11-07

About

The proposed project BPA-G1068 is a 1 MW solar generation project located in Clark County, Washington. It is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of June 21, 2024. The proposed commercial operation date is November 7, 2024.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Sifton 115kV Substation. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Clark

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Sifton 115kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.