BPA-G1070
219.5 MW hybrid in Columbia, WA · In queue since August 2024 · Proposed COD August 2027
219.5 MW
Capacity
2
Components
Solar + Battery
1y 9m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
3 years
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-31
BPA-G1070 is a proposed 219.5 MW hybrid solar and battery project located in Columbia County, Washington. The development project consists of a 109.6 MW solar component and a 109.9 MW battery component. It is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of August 19, 2024, and a proposed commercial operation date of August 31, 2027.
The interconnection agreement (IA) status for BPA-G1070 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Tucannon River: Puget Sound Energ 115kV Feeder 1.
Generated from interconnection queue and public data sources
State
WA
County
Columbia
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Tucannon River: Puget Sound Energ 115kV Feeder 1
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1070