WHITE WING RANCH SOLAR (CAISO-1062) — Project Summary

Queue ID
CAISO-1062
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Yuma, AZ
Region
CAISO
Developer
IA Status
IA Executed

WHITE WING RANCH SOLAR

CAISO-1062BetaActiveSolarBatteryCAISOLBNL + Live

400 MW hybrid in Yuma, AZ · In queue since April 2014 · Proposed COD June 2026

400 MW

Capacity

2

Components

Solar + Battery

12y 1m

In Queue

IA Executed

IA Status

COD target: 2026

Status
as of 19 months ago
Project statusOperationalBusiness Wire · 2024-10-30
Interconnection

Total Duration

12y 2m

Construction75%
Queue EntryApr 30, 2014

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-06-01

Technology
Solar200 MW · 50%
Battery200 MW · 50%
About

The White Wing Ranch Solar project is a proposed 400 MW hybrid solar and battery energy storage development in Yuma County, Arizona. The project, located within the California Independent System Operator (CAISO) region, consists of 200 MW of solar photovoltaic generation and 200 MW of battery storage. The project is interconnected to the San Diego Gas & Electric (SDGE) utility at the Hoodoo Wash Switchyard 500 kV.

The project entered the CAISO interconnection queue on April 30, 2014, assigned queue ID CAISO-1062. Its proposed commercial operation date is June 1, 2026, and the Interconnection Agreement (IA) has been executed. The White Wing Ranch Solar project has been the subject of recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Yuma

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

Hoodoo Wash Switchyard 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about WHITE WING RANCH SOLAR