AGUA CALIENTE SOLAR 2 (CAISO-1222) — Project Summary

Queue ID
CAISO-1222
Capacity
20 MW
Technology
Solar
Status
active
Location
Maricopa, AZ
Region
CAISO
Developer
IA Status
In Progress (unknown study)

AGUA CALIENTE SOLAR 2

CAISO-1222BetaActiveSolarCAISOLBNL + Live

20 MW generation in Maricopa, AZ · In queue since March 2016 · Proposed COD December 2016

20 MW

Capacity

1

Components

Solar

10y 2m

In Queue

In Progress (unknown study)

IA Status

COD target: 2016

Interconnection

Total Duration

9 months

Schedule

115 months past proposed COD

In Study38%
Queue EntryMar 8, 2016

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2016-12-01

About

The AGUA CALIENTE SOLAR 2 project is a proposed 20 MW solar generation project located in Maricopa County, Arizona. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-1222, with a queue entry date of March 8, 2016. The proposed commercial operation date is December 1, 2016.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The project's point of interconnection (POI) is the Hoodoo Wash Switchyard 500 kV, and the interconnecting utility is San Diego Gas & Electric (SDGE). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

Maricopa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

Hoodoo Wash Switchyard 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.