KYAN SOLAR
102 MW generation in Kern, CA · In queue since May 2016 · Proposed COD March 2027
102 MW
Capacity
1
Components
Solar
10 years
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
10y 10m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-03-02
The proposed KYAN SOLAR project is a 102 MW solar generation project located in Kern County, California. It is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1260, with an interconnection queue entry date of May 2, 2016. The proposed commercial operation date is March 2, 2027. The interconnecting utility is Pacific Gas & Electric (PGAE).
The project's interconnection agreement (IA) has been executed. The point of interconnection (POI) is the Midway-Wheeler Ridge #2 230 kV Line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Midway-Wheeler Ridge #2 230 kV Line
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about KYAN SOLAR