SOLAR STAR 3 (CAISO-1322) — Project Summary

Queue ID
CAISO-1322
Capacity
49.95 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
IA Executed

SOLAR STAR 3

CAISO-1322BetaActiveSolarBatteryCAISOLBNL + Live

49.95 MW hybrid in Kern, CA · In queue since May 2016 · Proposed COD August 2026

49.95 MW

Capacity

2

Components

Solar + Battery

10 years

In Queue

IA Executed

IA Status

Signed Oct 2019

Interconnection

Queue → IA

3y 5m

IA → COD

6y 10m

Total Duration

3y 5m

Construction75%
Queue EntryMay 2, 2016

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 11, 2019

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-08-12

Technology
Solar25 MW · 50%
Battery24.95 MW · 50%
About

The SOLAR STAR 3 project is a proposed 49.95 MW hybrid solar and battery energy storage project in Kern County, California. It consists of a 25 MW solar component and a 24.95 MW battery energy storage component. The project is located within the California Independent System Operator (CAISO) region and is interconnected with Southern California Edison (SCE) at the Whirlwind Substation 230kV.

The project, identified in the CAISO interconnection queue as CAISO-1322, entered the queue on May 2, 2016, with a proposed commercial operation date of August 12, 2026. An Interconnection Agreement (IA) for the project has been executed as of October 11, 2019. The project's current status is listed as active.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Whirlwind Substation 230kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ASTORIA2_7_N001
POI Substation
Whirlwind Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.