PASTORIA SOLAR
186.875 MW hybrid in Kern, CA · In queue since May 2016 · Proposed COD May 2026
186.875 MW
Capacity
2
Components
Solar + Battery
10 years
In Queue
IA Executed
IA Status
Signed Dec 2018
Queue → IA
2y 7m
IA → COD
7y 5m
Total Duration
2y 7m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2026-05-04
The PASTORIA SOLAR project is a proposed hybrid solar and battery energy storage project located in Kern County, California. The development project, with a total capacity of 186.88 MW, consists of a 106.88 MW solar component and an 80 MW battery energy storage system. The project is in the CAISO interconnection queue as entry CAISO-1335, with a queue entry date of May 2, 2016, and a proposed commercial operation date of May 4, 2026.
The interconnection agreement for the PASTORIA SOLAR project with Southern California Edison (SCE) was executed on December 4, 2018. The point of interconnection is the Pastoria Substation at 230kV. The project has been mentioned in recent news coverage related to grid infrastructure.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Pastoria Substation 230kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- EDMONSTN_2_N023
- POI Substation
- Pastoria Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.