PASTORIA SOLAR (CAISO-1335) — Project Summary

Queue ID
CAISO-1335
Capacity
186.875 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
IA Executed

PASTORIA SOLAR

CAISO-1335BetaActiveSolarBatteryCAISOLBNL + Live

186.875 MW hybrid in Kern, CA · In queue since May 2016 · Proposed COD May 2026

186.875 MW

Capacity

2

Components

Solar + Battery

10 years

In Queue

IA Executed

IA Status

Signed Dec 2018

Interconnection

Queue → IA

2y 7m

IA → COD

7y 5m

Total Duration

2y 7m

Construction75%
Queue EntryMay 2, 2016

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementDec 4, 2018

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-05-04

Technology
Solar106.875 MW · 57%
Battery80 MW · 43%
About

The PASTORIA SOLAR project is a proposed hybrid solar and battery energy storage project located in Kern County, California. The development project, with a total capacity of 186.88 MW, consists of a 106.88 MW solar component and an 80 MW battery energy storage system. The project is in the CAISO interconnection queue as entry CAISO-1335, with a queue entry date of May 2, 2016, and a proposed commercial operation date of May 4, 2026.

The interconnection agreement for the PASTORIA SOLAR project with Southern California Edison (SCE) was executed on December 4, 2018. The point of interconnection is the Pastoria Substation at 230kV. The project has been mentioned in recent news coverage related to grid infrastructure.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Pastoria Substation 230kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
EDMONSTN_2_N023
POI Substation
Pastoria Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.