LAS CAMAS 1
202.5 MW hybrid in Merced, CA · In queue since May 2017 · Proposed COD December 2027
202.5 MW
Capacity
2
Components
Solar + Battery
9 years
In Queue
IA Executed
IA Status
Signed Mar 2021
Queue → IA
3y 10m
IA → COD
6y 9m
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2027-12-31
The LAS CAMAS 1 project is a proposed 202.5 MW hybrid solar and battery energy storage project in Merced County, California. The project consists of a 102.5 MW solar component and a 100 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and interconnects with Pacific Gas & Electric (PGAE) at the Los Banos 230 kV point of interconnection.
The project, identified as CAISO-1382 in the CAISO interconnection queue, entered the queue on May 1, 2017. Its proposed commercial operation date is December 31, 2027. An Interconnection Agreement (IA) for the project has been executed, with the IA execution date being March 11, 2021. The project is currently listed as "active" in the interconnection queue.
Generated from interconnection queue and public data sources
State
CA
County
Merced
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Los Banos 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- SNTANLA_6_N001
- POI Substation
- Los Banos Substation