124.3 MW storage in Santa Clara, CA · In queue since April 2018 · Proposed COD January 2028
124.3 MW
Capacity
1
Components
Battery
8y 1m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
9y 9m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2028-01-01
AJO POWER BANK is a proposed 124.3 MW battery storage project located in Santa Clara County, California. The project is being developed within the CAISO interconnection queue as queue ID CAISO-1442. The project entered the queue on April 16, 2018, and has a proposed commercial operation date of January 1, 2028. The interconnection agreement (IA) for the project has been executed.
The project will interconnect with the PGAE utility at the Llagas-Gilroy 115 kV line point of interconnection.
Generated from interconnection queue and public data sources
State
CA
County
Santa Clara
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Llagas-Gilroy Foods 115 kV line
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.