CHALAN SOLAR
91.8 MW hybrid in Kern, CA · In queue since April 2018 · Proposed COD April 2026
91.8 MW
Capacity
2
Components
Solar + Battery
8y 1m
In Queue
IA Executed
IA Status
Signed Dec 2021
Queue → IA
3y 8m
IA → COD
4y 4m
Total Duration
3y 8m
Schedule
1 months past proposed COD
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2026-04-12
The CHALAN SOLAR project is a proposed 91.8 MW hybrid solar and battery energy storage development in Kern County, California. The project, located within the CAISO region and interconnected with PG&E, consists of a 66.6 MW solar array coupled with a 25.2 MW battery energy storage system. It is listed in the CAISO interconnection queue as CAISO-1495, with an entry date of April 16, 2018, and a proposed commercial operation date of April 12, 2026.
The project's interconnection agreement (IA) has been executed as of December 28, 2021. The point of interconnection (POI) is the Arco 230 kV substation. The CHALAN SOLAR project has been mentioned in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Arco 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- AGRICO_7_B1
- POI Substation
- Agrico