ARIDA SOLAR FARM (CAISO-1522) — Project Summary

Queue ID
CAISO-1522
Capacity
740 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
IA Status
System Impact Study

ARIDA SOLAR FARM

CAISO-1522BetaActiveSolarBatteryCAISOLBNL + Live

740 MW hybrid in Clark, NV · In queue since April 2018 · Proposed COD September 2027

740 MW

Capacity

2

Components

Solar + Battery

8y 1m

In Queue

System Impact Study

IA Status

COD target: 2027

Interconnection

Total Duration

9y 5m

Impact Study25%
Queue EntryApr 16, 2018

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

Technology
Solar370 MW · 50%
Battery370 MW · 50%
About

The Arida Solar Farm is a proposed 740 MW hybrid solar and battery project located in Clark County, Nevada. The development project consists of 370 MW of solar photovoltaic generation paired with 370 MW of battery energy storage. The project is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1522, with an interconnection queue entry date of April 16, 2018.

The proposed commercial operation date is September 15, 2027. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Mohave Substation 500kV, and the interconnecting utility is Southern California Edison (SCE). The Arida Solar Farm has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Mohave Substation 500kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SOPOINT_LNODE-2
POI Substation
Mohave Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.