TANAGER STORAGE
200 MW storage in Santa Clara, CA · In queue since April 2019 · Proposed COD December 2027
200 MW
Capacity
1
Components
Battery
7y 1m
In Queue
IA Executed
IA Status
Signed Dec 2021
Queue → IA
2y 8m
IA → COD
6 years
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2027-12-15
The Tanager Storage project is a proposed 200 MW battery energy storage system located in Santa Clara County, California. The project is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1550. Its queue entry date was April 15, 2019, and the proposed commercial operation date is December 15, 2027.
The project's Interconnection Agreement (IA) was executed on December 22, 2021. The designated utility is Pacific Gas and Electric (PGAE), and the point of interconnection (POI) is the Los Esteros 230 kV substation. The project is currently listed as active in the CAISO queue.
Generated from interconnection queue and public data sources
State
CA
County
Santa Clara
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Los Esteros 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- LECEFGT2_7_B1
- POI Substation
- Los Esteros Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.