JEWELFLOWER STORAGE
354.88 MW storage in Santa Clara, CA · In queue since April 2019 · Proposed COD March 2029
354.88 MW
Capacity
1
Components
Battery
7y 1m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
9y 11m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-28
The JewelFlower Storage project is a proposed 354.88 MW battery storage project located in Santa Clara County, California. Interconnection is requested through the CAISO queue, with queue ID CAISO-1553, having entered the queue on April 15, 2019. The current interconnection status is System Impact Study, and the proposed commercial operation date is March 28, 2029.
The project, which interconnects with PG&E at the Metcalf 230 kV point of interconnection, has been mentioned in recent industry news.
Generated from interconnection queue and public data sources
State
CA
County
Santa Clara
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Metcalf 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- MERIDIAN_6_N101
- POI Substation
- Metcalf Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about JEWELFLOWER STORAGE