99 MW storage in San Joaquin, CA · In queue since April 2019 · Proposed COD April 2029
99 MW
Capacity
1
Components
Battery
7y 1m
In Queue
IA Executed
IA Status
Signed Dec 2021
Queue → IA
2y 8m
IA → COD
7y 4m
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 6–18 months
Proposed COD: 2029-04-16
The Noosa Energy Storage project is a proposed 99 MW battery storage project located in San Joaquin County, California. The project is interconnected within the CAISO region and is linked to the existing Noosa Energy Storage LLC operating plant. It entered the CAISO interconnection queue as queue ID CAISO-1557 on April 15, 2019, with a proposed commercial operation date of April 16, 2029.
The project's Interconnection Agreement (IA) was executed on December 21, 2021. The point of interconnection (POI) is the Ripon 115 kV substation. Recent news coverage indicates the project has been mentioned in relation to grid developments.
Generated from interconnection queue and public data sources
State
CA
County
San Joaquin
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Ripon 115 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- RIPON_6_RGSUNIT2GNODE
- POI Substation
- Ripon Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.