AIR STATION 1 (CAISO-1568) — Project Summary

Queue ID
CAISO-1568
Capacity
42.1 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
IA Status
In Progress (unknown study)

AIR STATION 1

CAISO-1568BetaActiveSolarBatteryCAISOLBNL + Live

42.1 MW hybrid in Kings, CA · In queue since April 2019 · Proposed COD December 2021

42.1 MW

Capacity

2

Components

Solar + Battery

7y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2021

Interconnection

Total Duration

2y 8m

Schedule

53 months past proposed COD

In Study38%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2021-12-31

Technology
Solar21.05 MW · 50%
Battery21.05 MW · 50%
About

The proposed AIR STATION 1 project is a 42.1 MW hybrid solar and battery energy storage development in Kings County, California. The project consists of 21.05 MW of solar photovoltaic generation paired with 21.05 MW of battery energy storage. It is located within the California Independent System Operator (CAISO) region and interconnects to the PG&E utility grid at the Henrietta-Lemoore NAS 70 kV point of interconnection.

AIR STATION 1 entered the CAISO interconnection queue as queue ID CAISO-1568 on April 15, 2019. The developer's proposed commercial operation date is December 31, 2021. The project's interconnection agreement status is listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Henrietta-Lemoore NAS 70 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about AIR STATION 1