AIR STATION 1
42.1 MW hybrid in Kings, CA · In queue since April 2019 · Proposed COD December 2021
42.1 MW
Capacity
2
Components
Solar + Battery
7y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2021
Total Duration
2y 8m
Schedule
53 months past proposed COD
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-12-31
The proposed AIR STATION 1 project is a 42.1 MW hybrid solar and battery energy storage development in Kings County, California. The project consists of 21.05 MW of solar photovoltaic generation paired with 21.05 MW of battery energy storage. It is located within the California Independent System Operator (CAISO) region and interconnects to the PG&E utility grid at the Henrietta-Lemoore NAS 70 kV point of interconnection.
AIR STATION 1 entered the CAISO interconnection queue as queue ID CAISO-1568 on April 15, 2019. The developer's proposed commercial operation date is December 31, 2021. The project's interconnection agreement status is listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Henrietta-Lemoore NAS 70 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about AIR STATION 1