ARATINA SOLAR CENTER 2 (CAISO-1604) — Project Summary

Queue ID
CAISO-1604
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
IA Executed

ARATINA SOLAR CENTER 2

CAISO-1604BetaActiveSolarBatteryCAISOLBNL + Live

400 MW hybrid in Kern, CA · In queue since April 2019 · Proposed COD December 2026

400 MW

Capacity

2

Components

Solar + Battery

7y 1m

In Queue

IA Executed

IA Status

Signed Jul 2021

Status
as of 5y 8m ago
Latest milestoneEIR determination · 2020-08-14Mojave Desert News · 2020-09-02
Interconnection

Queue → IA

2y 3m

IA → COD

5y 5m

Total Duration

2y 3m

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJul 29, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2026-12-31

Technology
Solar200 MW · 50%
Battery200 MW · 50%
About

The Aratina Solar Center 2 is a proposed 400 MW hybrid solar and battery energy storage project located in Kern County, California. The development project consists of 200 MW of solar photovoltaic generation paired with a 200 MW battery energy storage system. The project is in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-1604, with an initial queue entry date of April 15, 2019. The proposed commercial operation date is December 31, 2026.

The project has an executed interconnection agreement (IA), dated July 29, 2021. The point of interconnection is the Kramer Substation at 230kV, and the interconnecting utility is Southern California Edison (SCE). The Aratina Solar Center 2 project has been mentioned in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Kramer Substation 230kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
KRAMER_1_N001
POI Substation
Kramer Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26