ROUGH HAT HYBRID SOLAR (CAISO-1650) — Project Summary

Queue ID
CAISO-1650
Capacity
404 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
IA Status
IA Executed

ROUGH HAT HYBRID SOLAR

CAISO-1650BetaActiveSolarBatteryCAISOLBNL + Live

404 MW hybrid in Nye, NV · In queue since April 2019 · Proposed COD July 2028

404 MW

Capacity

2

Components

Solar + Battery

7y 1m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

9y 3m

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-07-31

Technology
Solar204 MW · 50%
Battery200 MW · 50%
About

The ROUGH HAT HYBRID SOLAR project is a proposed 404 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 204 MW solar photovoltaic array coupled with a 200 MW battery energy storage system. It is listed in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1650, with an entry date of April 15, 2019. The proposed commercial operation date is July 31, 2028, and the Interconnection Agreement (IA) has been executed.

The project is interconnected to the grid via the Trout Canyon Substation at 230 kV. The transmission provider is GLW. The project is currently listed as active in the CAISO queue and has appeared in recent news coverage regarding renewable energy development in Nevada.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Trout Canyon Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CANYONP4_7_GN001
POI Substation
Canyon

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about ROUGH HAT HYBRID SOLAR