ROUGH HAT HYBRID SOLAR
404 MW hybrid in Nye, NV · In queue since April 2019 · Proposed COD July 2028
404 MW
Capacity
2
Components
Solar + Battery
7y 1m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
9y 3m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2028-07-31
The ROUGH HAT HYBRID SOLAR project is a proposed 404 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 204 MW solar photovoltaic array coupled with a 200 MW battery energy storage system. It is listed in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-1650, with an entry date of April 15, 2019. The proposed commercial operation date is July 31, 2028, and the Interconnection Agreement (IA) has been executed.
The project is interconnected to the grid via the Trout Canyon Substation at 230 kV. The transmission provider is GLW. The project is currently listed as active in the CAISO queue and has appeared in recent news coverage regarding renewable energy development in Nevada.
Generated from interconnection queue and public data sources
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
—
Point of Interconnection
Trout Canyon Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CANYONP4_7_GN001
- POI Substation
- Canyon
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about ROUGH HAT HYBRID SOLAR