SANDPIPER STORAGE (CAISO-1657) — Project Summary

Queue ID
CAISO-1657
Capacity
200 MW
Technology
Battery
Status
active
Location
Orange, CA
Region
CAISO
Developer
IA Status
IA Executed

SANDPIPER STORAGE

CAISO-1657BetaActiveBatteryCAISOLBNL + Live

200 MW storage in Orange, CA · In queue since April 2019 · Proposed COD April 2026

200 MW

Capacity

1

Components

Battery

7y 1m

In Queue

IA Executed

IA Status

Signed Sep 2021

Interconnection

Queue → IA

2y 5m

IA → COD

4y 7m

Total Duration

2y 5m

Schedule

1 months past proposed COD

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementSep 9, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2026-04-15

About

The SANDPIPER STORAGE project is a proposed 200 MW battery energy storage system located in Orange County, California. The project is interconnected within the California Independent System Operator (CAISO) region, specifically with San Diego Gas & Electric (SDGE) as the utility. It is listed in the CAISO interconnection queue as queue ID CAISO-1657, with an entry date of April 15, 2019, and a proposed commercial operation date of April 15, 2026.

The project's interconnection agreement (IA) has been executed as of September 9, 2021. The point of interconnection (POI) is the Talega Substation 138 kV. Recent news coverage has discussed the project, with articles categorized under industry and development.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Orange

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

Talega Substation 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
PICO_1_N001
POI Substation
Talega Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.