SUNRISE BUTTE (CAISO-1667) — Project Summary

Queue ID
CAISO-1667
Capacity
150 MW
Technology
Solar+Battery
Status
active
Location
Imperial, CA
Region
CAISO
Developer
IA Status
IA Executed

SUNRISE BUTTE

CAISO-1667BetaActiveSolarBatteryCAISOLBNL + Live

150 MW hybrid in Imperial, CA · In queue since April 2019 · Proposed COD November 2029

150 MW

Capacity

1

Components

Battery

7y 1m

In Queue

IA Executed

IA Status

COD target: 2029

Interconnection

Total Duration

10y 7m

Construction75%
Queue EntryApr 15, 2019

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-11-18

About

The SUNRISE BUTTE project is a proposed 150 MW hybrid solar and battery energy storage project located in Imperial County, California. Interconnecting to the Imperial Valley Substation at 230 kV, the project consists of solar generation paired with a 150 MW battery energy storage system.

The project is listed in the CAISO interconnection queue as queue ID CAISO-1667, with an entry date of April 15, 2019. The proposed commercial operation date is November 18, 2029, and the interconnection agreement has been executed. The project is actively listed in the queue and is within the service territory of SDGE.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Imperial

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

Point of Interconnection

Imperial Valley Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WESCAN_7_N002
POI Substation
Imperial Valley Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.