HAWKINS SOLAR HYBRID (CAISO-1736) — Project Summary

Queue ID
CAISO-1736
Capacity
500 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
In Progress (unknown study)

HAWKINS SOLAR HYBRID

CAISO-1736BetaActiveSolarBatteryCAISOLBNL + Live

500 MW hybrid in Kern, CA · In queue since April 2020 · Proposed COD May 2027

500 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

7y 1m

In Study38%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-05-01

Technology
Solar250 MW · 50%
Battery250 MW · 50%
About

The Hawkins Solar Hybrid project is a proposed 500 MW hybrid solar and battery energy storage development in Kern County, California. The project consists of a 250 MW solar photovoltaic array coupled with a 250 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the Arco 230 kV point of interconnection.

The project, identified as CAISO-1736 in the CAISO interconnection queue, entered the queue on April 15, 2020, with a proposed commercial operation date of May 1, 2027. The interconnection agreement status is currently listed as "In Progress (unknown study)". The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Arco 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
AGRICO_7_B1
POI Substation
Agrico

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.