PUFF HYBRID SOLAR (CAISO-1740) — Project Summary

Queue ID
CAISO-1740
Capacity
203.6 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
System Impact Study

PUFF HYBRID SOLAR

CAISO-1740BetaActiveSolarBatteryCAISOLBNL + Live

203.6 MW hybrid in Kern, CA · In queue since April 2020 · Proposed COD September 2030

203.6 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

System Impact Study

IA Status

COD target: 2030

Interconnection

Total Duration

10y 5m

Impact Study25%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-09-01

Technology
Solar101.8 MW · 50%
Battery101.8 MW · 50%
About

The PUFF HYBRID SOLAR project is a proposed 203.6 MW hybrid solar and battery energy storage project in Kern County, California. The project consists of 101.8 MW of solar generation paired with 101.8 MW of battery storage. It is located within the CAISO region and is interconnected to the PGAE utility grid at the Arco 230 kV point of interconnection.

The project, identified as CAISO-1740 in the CAISO interconnection queue, entered the queue on April 15, 2020. Its proposed commercial operation date is September 1, 2030. The project's interconnection status is currently in the System Impact Study phase.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Arco 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
AGRICO_7_B1
POI Substation
Agrico

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about PUFF HYBRID SOLAR