SUNRISE POWER IMPROVEMENT
655.7 MW generation in Kern, CA · In queue since April 2020 · Proposed COD May 2024
655.7 MW
Capacity
1
Components
Gas
6y 1m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
4y 1m
Schedule
24 months past proposed COD
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-05-11
The SUNRISE POWER IMPROVEMENT project is a proposed 655.7 MW natural gas generation project located in Kern County, California. The project is listed in the CAISO interconnection queue as entry CAISO-1745, with a queue entry date of April 15, 2020, and a proposed commercial operation date of May 11, 2024. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is Midway 230 kV, and the utility is PGAE.
The proposed project is linked to the existing Sunrise Power LLC operating plant (EIA plant ID 55182). The SUNRISE POWER IMPROVEMENT project has been mentioned in recent news, with 21 articles covering topics such as industry, grid, deals, and regulatory matters.
Generated from interconnection queue and public data sources
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Midway 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SUNRIS_2_PL1X3-APND
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26