WINSTON HYBRID PV AND BESS (CAISO-1751) — Project Summary

Queue ID
CAISO-1751
Capacity
306 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
IA Executed

WINSTON HYBRID PV AND BESS

CAISO-1751BetaActiveSolarBatteryCAISOLBNL + Live

306 MW hybrid in Kern, CA · In queue since April 2020 · Proposed COD December 2028

306 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

8y 8m

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-12-10

Technology
Solar204 MW · 67%
Battery102 MW · 33%
About

The Winston Hybrid PV and BESS project is a proposed 306 MW hybrid solar and battery energy storage system development in Kern County, California. The project consists of a 204 MW solar photovoltaic array coupled with a 102 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the PG&E utility grid at the Midway 115 kV point of interconnection.

The project, identified as CAISO-1751 in the CAISO interconnection queue, entered the queue on April 15, 2020, and has a proposed commercial operation date of December 10, 2028. The Interconnection Agreement (IA) for the project has been executed. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Midway 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MIDWAY_1_N084
POI Substation
Midway Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.