SAPPHIRE SOLAR (CAISO-1764) — Project Summary

Queue ID
CAISO-1764
Capacity
243.2907 MW
Technology
Solar+Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
IA Status
IA Executed

SAPPHIRE SOLAR

CAISO-1764BetaActiveSolarBatteryCAISOLBNL + Live

243.291 MW hybrid in Riverside, CA · In queue since April 2020 · Proposed COD December 2034

243.291 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

IA Executed

IA Status

COD target: 2034

Interconnection

Total Duration

14y 8m

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2034-12-31

Technology
Solar126.291 MW · 52%
Battery117 MW · 48%
About

The Sapphire Solar project is a proposed 243.29 MW hybrid solar and battery energy storage project located in Riverside County, California. The development project consists of a 126.29 MW solar component and a 117 MW battery energy storage system. It is interconnected to the CAISO grid at the Red Bluff Substation 230kV and is in the CAISO interconnection queue as entry CAISO-1764, with a queue entry date of April 15, 2020. The project's proposed commercial operation date is December 31, 2034, and the Interconnection Agreement (IA) has been executed.

The Sapphire Solar project has been the subject of recent news coverage, with six articles categorized as regulatory (3), deals (2), and industry (1).

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Red Bluff Substation 230kV

Data Source

LBNL + Live

DeveloperEDF Renewables North AmericaSaur Energy · 2023-03-23
TransactionPPASaur Energy · 2023-03-23
OfftakerSouthern California Public Power AuthoritySaur Energy · 2023-03-23
PPA structurePhysicalSaur Energy · 2023-03-23
PPA term20 yearsSaur Energy · 2023-03-23
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (1)Beta

Last updated 2026-03-26

View all articles

No ask pi reports yet for this entity.

ask pi about SAPPHIRE SOLAR