SHOALS ENERGY STORAGE
409 MW storage in Ventura, CA · In queue since April 2020 · Proposed COD October 2030
409 MW
Capacity
1
Components
Battery
6y 1m
In Queue
System Impact Study
IA Status
COD target: 2030
Total Duration
10y 6m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-10-08
The Shoals Energy Storage project is a proposed 409 MW battery storage development in Ventura County, California. The project, under consideration in the CAISO interconnection queue (queue ID CAISO-1783), is being evaluated for connection to the Mandalay Switchyard 220kV. The queue entry date is April 15, 2020, with a proposed commercial operation date of October 8, 2030. The project's interconnection status is currently in the System Impact Study phase.
The Shoals Energy Storage project has been mentioned in recent industry news.
Generated from interconnection queue and public data sources
State
CA
County
Ventura
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Mandalay Switchyard 220kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- MANDLY1G_7_N002
- POI Substation
- Mandalay Switchyard
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.