ARIDA 3 SOLAR FARM (CAISO-1795) — Project Summary

Queue ID
CAISO-1795
Capacity
900 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
IA Status
System Impact Study

ARIDA 3 SOLAR FARM

CAISO-1795BetaActiveSolarBatteryCAISOLBNL + Live

900 MW hybrid in Clark, NV · In queue since April 2020 · Proposed COD July 2030

900 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

System Impact Study

IA Status

COD target: 2030

Interconnection

Total Duration

10y 3m

Impact Study25%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-07-01

Technology
Solar450 MW · 50%
Battery450 MW · 50%
About

The proposed ARIDA 3 SOLAR FARM is a 900 MW hybrid solar and battery project located in Clark County, Nevada. The development project consists of 450 MW of solar generation paired with 450 MW of battery storage. It is interconnected to the CAISO grid at the Mohave Substation 500kV and is in the CAISO interconnection queue as queue ID CAISO-1795.

The project entered the queue on April 15, 2020, and has a proposed commercial operation date of July 1, 2030. Its interconnection status is currently in the System Impact Study phase. The interconnecting utility is Southern California Edison (SCE). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Mohave Substation 500kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SOPOINT_LNODE-2
POI Substation
Mohave Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.