ROUGH HAT 2 (CAISO-1799) — Project Summary

Queue ID
CAISO-1799
Capacity
407.6 MW
Technology
Solar+Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
IA Status
IA Executed

ROUGH HAT 2

CAISO-1799BetaActiveSolarBatteryCAISOLBNL + Live

407.6 MW hybrid in Clark, NV · In queue since April 2020 · Proposed COD December 2027

407.6 MW

Capacity

2

Components

Solar + Battery

6y 1m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

7y 8m

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-01

Technology
Solar203.8 MW · 50%
Battery203.8 MW · 50%
About

The ROUGH HAT 2 project is a proposed 407.6 MW hybrid solar and battery energy storage project in Clark County, Nevada. The development project consists of 203.8 MW of solar generation capacity coupled with 203.8 MW of battery storage. The project is located within the California Independent System Operator (CAISO) region and is interconnected to the grid via the Trout Canyon Substation at 230 kV.

ROUGH HAT 2 entered the CAISO interconnection queue as queue ID CAISO-1799 on April 15, 2020, with a proposed commercial operation date of December 1, 2027. The project's interconnection agreement has been executed. Recent news coverage has discussed the project in the context of the energy industry and grid development.

Generated from interconnection queue and public data sources

Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

GLW

Entity

CAISO

Service Type

Point of Interconnection

Trout Canyon Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
CANYONP4_7_GN001
POI Substation
Canyon

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.