VIENTO FRONTERIZO
1,001 MW generation in Municipality Of Tecate, MX · In queue since April 2020 · Proposed COD May 2033
1,001 MW
Capacity
1
Components
Wind
6y 1m
In Queue
System Impact Study
IA Status
COD target: 2033
Total Duration
13y 1m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2033-05-10
The Viento Fronterizo project is a proposed 1001 MW wind generation project located in the Municipality Of Tecate, Mexico, within the California Independent System Operator (CAISO) region. The project, which consists of 1001 MW of wind capacity, is interconnected with San Diego Gas & Electric (SDGE) at the East County Substation 500 kV.
The project entered the CAISO interconnection queue as queue ID CAISO-1824 on April 15, 2020. Its proposed commercial operation date is May 10, 2033. The project's interconnection status is currently in the System Impact Study phase.
Generated from interconnection queue and public data sources
State
MX
County
Municipality Of Tecate
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
—
Point of Interconnection
East County Substation 500 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about VIENTO FRONTERIZO