ARGES BESS
102.15 MW storage in Solano, CA · In queue since April 2021 · Proposed COD June 2029
102.15 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
8y 2m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-18
The ARGES BESS project is a proposed 102.15 MW battery storage project located in Solano County, California. The project is in the CAISO interconnection queue (queue ID CAISO-1856) with an interconnection queue entry date of April 15, 2021. The proposed commercial operation date is June 18, 2029.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Vaca-Dixon 115 kV substation. Pacific Gas and Electric (PGAE) is the utility associated with the project. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Solano
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Vaca-Dixon 115 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.