PALMETTO ENERGY STORAGE (CAISO-1880) — Project Summary

Queue ID
CAISO-1880
Capacity
75.6 MW
Technology
Battery
Status
active
Location
Alameda, CA
Region
CAISO
Developer
IA Status
System Impact Study

PALMETTO ENERGY STORAGE

CAISO-1880BetaActiveBatteryCAISOLBNL + Live

75.6 MW storage in Alameda, CA · In queue since April 2021 · Proposed COD July 2030

75.6 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2030

Interconnection

Total Duration

9y 3m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-07-22

About

The Palmetto Energy Storage project is a proposed 75.6 MW battery storage project located in Alameda County, California. The project, under development in the CAISO region, entered the CAISO interconnection queue as queue ID CAISO-1880 on April 15, 2021. Its proposed commercial operation date is July 22, 2030. The project's interconnection status is currently in the System Impact Study phase.

The project is interconnected with PG&E at the Oakland C 115 kV point of interconnection. Palmetto Energy Storage has been the subject of recent news coverage, with three articles focusing on industry and grid-related aspects of the development.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Alameda

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Oakland C 115 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OAKLAND_1_N006
POI Substation
Oakland C Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about PALMETTO ENERGY STORAGE