SPECTRUM ENERGY STORAGE
504 MW storage in Alameda, CA · In queue since April 2021 · Proposed COD February 2032
504 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2032
Total Duration
10y 10m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2032-02-29
The SPECTRUM ENERGY STORAGE project is a proposed 504 MW battery storage project located in Alameda County, California. The project is in the CAISO interconnection queue as entry CAISO-1881, with a queue entry date of April 15, 2021, and a proposed commercial operation date of February 29, 2032. The project's interconnection status is currently in the System Impact Study phase. The project is interconnected to the PGAE utility at the Tesla-Newark #1 230 kV Line point of interconnection.
The SPECTRUM ENERGY STORAGE project has been featured in recent news coverage, with two articles categorized as regulatory and industry news.
Generated from interconnection queue and public data sources
State
CA
County
Alameda
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Tesla-Newark #1 230 kV Line
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about SPECTRUM ENERGY STORAGE