EL REY POWER BANK (CAISO-1928) — Project Summary

Queue ID
CAISO-1928
Capacity
124.3 MW
Technology
Battery
Status
active
Location
Monterey, CA
Region
CAISO
Developer
IA Status
System Impact Study

EL REY POWER BANK

CAISO-1928BetaActiveBatteryCAISOLBNL + Live

124.3 MW storage in Monterey, CA · In queue since April 2021 · Proposed COD January 2029

124.3 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2029

Interconnection

Total Duration

7y 9m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-01-02

About

The El Rey Power Bank is a proposed 124.3 MW battery storage project in Monterey County, California. The project is located within the CAISO region and is being developed for Pacific Gas & Electric (PGAE). It entered the CAISO interconnection queue as queue ID CAISO-1928 on April 15, 2021. The proposed commercial operation date is January 2, 2029, and its interconnection status is currently in the System Impact Study phase.

The El Rey Power Bank development has been the subject of recent news coverage, with five articles appearing in the press. These articles cover topics such as potential hazards, deals, industry trends, and project development.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Monterey

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Coburn-Basic Energy 60 kV Line

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.