EL REY POWER BANK
124.3 MW storage in Monterey, CA · In queue since April 2021 · Proposed COD January 2029
124.3 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
7y 9m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-02
The El Rey Power Bank is a proposed 124.3 MW battery storage project in Monterey County, California. The project is located within the CAISO region and is being developed for Pacific Gas & Electric (PGAE). It entered the CAISO interconnection queue as queue ID CAISO-1928 on April 15, 2021. The proposed commercial operation date is January 2, 2029, and its interconnection status is currently in the System Impact Study phase.
The El Rey Power Bank development has been the subject of recent news coverage, with five articles appearing in the press. These articles cover topics such as potential hazards, deals, industry trends, and project development.
Generated from interconnection queue and public data sources
State
CA
County
Monterey
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Coburn-Basic Energy 60 kV Line
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about EL REY POWER BANK