LOCK STORAGE
508 MW storage in Fresno, CA · In queue since April 2021 · Proposed COD December 2027
508 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2027
Total Duration
6y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-15
The LOCK STORAGE project is a proposed 508 MW battery storage project located in Fresno County, California. Interconnecting to the PG&E utility, the project is in the CAISO interconnection queue as entry CAISO-1962, with a queue entry date of April 15, 2021. The proposed commercial operation date is December 15, 2027. The project's interconnection status is currently in the System Impact Study phase.
The LOCK STORAGE project has been the subject of recent news coverage, with three articles categorized as regulatory and industry news.
Generated from interconnection queue and public data sources
State
CA
County
Fresno
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
—
Point of Interconnection
Gates 500 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- FIFTHS_7_N003
- POI Substation
- Gates Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about LOCK STORAGE