ALMANDE ENERGY STORAGE (CAISO-1963) — Project Summary

Queue ID
CAISO-1963
Capacity
256.29 MW
Technology
Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
IA Status
System Impact Study

ALMANDE ENERGY STORAGE

CAISO-1963BetaActiveBatteryCAISOLBNL + Live

256.29 MW storage in Merced, CA · In queue since April 2021 · Proposed COD June 2030

256.29 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2030

Interconnection

Total Duration

9y 2m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-18

About

The Almandé Energy Storage project is a proposed 256.29 MW battery storage project located in Merced County, California. The project is in the CAISO interconnection queue as entry CAISO-1963, with a queue entry date of April 15, 2021. The proposed commercial operation date is June 18, 2030. The project's interconnection status is currently in the System Impact Study phase.

The project, which is being developed within the Pacific Gas and Electric (PGAE) service area, consists solely of battery storage with a total capacity of 256.29 MW. The point of interconnection (POI) is the Wilson 230 kV substation. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Wilson 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Wilson Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.