BUTTONBUSH SOLAR 2 (CAISO-1987) — Project Summary

Queue ID
CAISO-1987
Capacity
716.4 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
System Impact Study

BUTTONBUSH SOLAR 2

CAISO-1987BetaActiveSolarBatteryCAISOLBNL + Live

716.4 MW hybrid in Kern, CA · In queue since April 2021 · Proposed COD March 2032

716.4 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2032

Interconnection

Total Duration

10y 11m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2032-03-17

Technology
Solar358.2 MW · 50%
Battery358.2 MW · 50%
About

The BUTTONBUSH SOLAR 2 project is a proposed 716.4 MW hybrid solar and battery energy storage project in Kern County, California. The development project consists of 358.2 MW of solar photovoltaic generation paired with 358.2 MW of battery storage. The project is located within the CAISO region and is interconnected to the PG&E utility grid at the Midway 500 kV point of interconnection.

The project, identified by queue ID CAISO-1987, entered the CAISO interconnection queue on April 15, 2021. Its proposed commercial operation date is March 17, 2032. The project's interconnection status is currently in the System Impact Study phase. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Midway 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MIDWAY_1_N084
POI Substation
Midway Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.