CHERRY LANE HYBRID (CAISO-2015) — Project Summary

Queue ID
CAISO-2015
Capacity
621.26 MW
Technology
Solar+Battery
Status
active
Location
Kern, CA
Region
CAISO
Developer
IA Status
System Impact Study

CHERRY LANE HYBRID

CAISO-2015BetaActiveSolarBatteryCAISOLBNL + Live

621.26 MW hybrid in Kern, CA · In queue since April 2021 · Proposed COD June 2031

621.26 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2031

Interconnection

Total Duration

10y 2m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-06-19

Technology
Solar310.63 MW · 50%
Battery310.63 MW · 50%
About

The CHERRY LANE HYBRID project is a proposed 621.26 MW hybrid solar and battery energy storage development in Kern County, California. The project consists of 310.63 MW of solar photovoltaic generation paired with 310.63 MW of battery storage. It is located within the CAISO region and interconnects to the grid at the Wheeler Ridge 230 kV point of interconnection.

The project is listed in the CAISO interconnection queue as CAISO-2015, with a queue entry date of April 15, 2021. The proposed commercial operation date is June 19, 2031. Its interconnection status is currently in the System Impact Study phase.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

PGAE

Entity

CAISO

Service Type

Point of Interconnection

Wheeler Ridge 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
WHEELER_6_N001
POI Substation
Wheeler Ridge Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.