SOCORRO PEAK SOLAR (CAISO-2022) — Project Summary

Queue ID
CAISO-2022
Capacity
755.7908 MW
Technology
Solar+Battery
Status
active
Location
La Paz, AZ
Region
CAISO
Developer
IA Status
System Impact Study

SOCORRO PEAK SOLAR

CAISO-2022BetaActiveSolarBatteryCAISOLBNL + Live

755.791 MW hybrid in La Paz, AZ · In queue since April 2021 · Proposed COD March 2029

755.791 MW

Capacity

2

Components

Solar + Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2029

Interconnection

Total Duration

7y 11m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-26

Technology
Solar379.751 MW · 50%
Battery376.04 MW · 50%
About

The Socorro Peak Solar project is a proposed 755.79 MW hybrid solar and battery energy storage development in La Paz County, Arizona. The project, under development by DCRT, consists of a 379.75 MW solar array coupled with a 376.04 MW battery energy storage system. It is currently active in the California Independent System Operator (CAISO) interconnection queue, identified as CAISO-2022, with an interconnection queue entry date of April 15, 2021. The proposed commercial operation date is March 26, 2029. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Cielo Azul Substation 500 kV.

The Socorro Peak Solar project has been the subject of recent news coverage related to regulatory matters.

Generated from interconnection queue and public data sources

Project Details

State

AZ

County

La Paz

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

DCRT

Entity

CAISO

Service Type

Point of Interconnection

Cielo Azul Substation 500 kV

Data Source

LBNL + Live

ApplicantEDF Renewablespv magazine USA · 2024-07-02
AgencyBureau of Land Managementpv magazine USA · 2024-07-02
RulingNoticepv magazine USA · 2024-07-02
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.