RANEGRAS PVS
1,437.62 MW hybrid in La Paz, AZ · In queue since April 2021 · Proposed COD July 2029
1,437.62 MW
Capacity
2
Components
Solar + Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-07-26
The RANEGRAS PVS project is a proposed 1437.62 MW hybrid solar and battery energy storage project in La Paz County, Arizona. The development project consists of 718.81 MW of solar photovoltaic generation and 718.81 MW of battery storage. It is located within the California Independent System Operator (CAISO) region and is being developed by DCRT.
The project, identified as CAISO-2025 in the interconnection queue, entered the queue on April 15, 2021, and has a proposed commercial operation date of July 26, 2029. Its interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Colorado River-Delaney 500 kV line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
AZ
County
La Paz
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
DCRT
Entity
CAISO
Service Type
—
Point of Interconnection
Colorado River-Delaney 500 kV line
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.