SANDRIFT STORAGE 1 (CAISO-2039) — Project Summary

Queue ID
CAISO-2039
Capacity
254.77 MW
Technology
Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
IA Status
System Impact Study

SANDRIFT STORAGE 1

CAISO-2039BetaActiveBatteryCAISOLBNL + Live

254.77 MW storage in Riverside, CA · In queue since April 2021 · Proposed COD December 2030

254.77 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2030

Interconnection

Total Duration

9y 8m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-26

About

The SANDRIFT STORAGE 1 project is a proposed battery storage project located in Riverside County, California, with a total capacity of 254.77 MW. The project is in the CAISO interconnection queue (queue ID CAISO-2039) as of April 15, 2021, and has a proposed commercial operation date of December 26, 2030. The project's interconnection point is the Red Bluff Substation at 230 kV.

The SANDRIFT STORAGE 1 project's interconnection status is currently in the System Impact Study phase. The project is interconnected with Southern California Edison (SCE) within the CAISO region. Recent news coverage has discussed the project's progress and potential impact on the grid.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Red Bluff Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about SANDRIFT STORAGE 1