SANDRIFT STORAGE 1
254.77 MW storage in Riverside, CA · In queue since April 2021 · Proposed COD December 2030
254.77 MW
Capacity
1
Components
Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2030
Total Duration
9y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-26
The SANDRIFT STORAGE 1 project is a proposed battery storage project located in Riverside County, California, with a total capacity of 254.77 MW. The project is in the CAISO interconnection queue (queue ID CAISO-2039) as of April 15, 2021, and has a proposed commercial operation date of December 26, 2030. The project's interconnection point is the Red Bluff Substation at 230 kV.
The SANDRIFT STORAGE 1 project's interconnection status is currently in the System Impact Study phase. The project is interconnected with Southern California Edison (SCE) within the CAISO region. Recent news coverage has discussed the project's progress and potential impact on the grid.
Generated from interconnection queue and public data sources
State
CA
County
Riverside
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Red Bluff Substation 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- OBERON_7_N122
- POI Substation
- Red Bluff Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.