SANDRIFT STORAGE 2 (CAISO-2041) — Project Summary

Queue ID
CAISO-2041
Capacity
254.77 MW
Technology
Battery
Status
active
Location
Riverside, CA
Region
CAISO
Developer
IA Status
System Impact Study

SANDRIFT STORAGE 2

CAISO-2041BetaActiveBatteryCAISOLBNL + Live

254.77 MW storage in Riverside, CA · In queue since April 2021 · Proposed COD March 2031

254.77 MW

Capacity

1

Components

Battery

5y 1m

In Queue

System Impact Study

IA Status

COD target: 2031

Interconnection

Total Duration

9y 11m

Impact Study25%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-03-01

About

SANDRIFT STORAGE 2 is a proposed battery storage project located in Riverside County, California, with a total capacity of 254.77 MW. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-2041, with a queue entry date of April 15, 2021. The proposed commercial operation date is March 1, 2031. The project's interconnection status is currently in the System Impact Study phase. Southern California Edison (SCE) is the utility.

The development project consists entirely of battery storage. It has appeared in recent news coverage related to development.

Generated from interconnection queue and public data sources

Project Details

State

CA

County

Riverside

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SCE

Entity

CAISO

Service Type

Point of Interconnection

Red Bluff Substation 230 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
OBERON_7_N122
POI Substation
Red Bluff Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.