860.384 MW hybrid in Riverside, CA · In queue since April 2021 · Proposed COD November 2029
860.384 MW
Capacity
2
Components
Solar + Battery
5y 1m
In Queue
System Impact Study
IA Status
COD target: 2029
Total Duration
8y 7m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-26
The proposed INVICTUS project is an 860.38 MW hybrid solar and battery energy storage development in Riverside County, California. The project consists of 430.19 MW of solar photovoltaic generation paired with 430.19 MW of battery storage. It is located within the California Independent System Operator (CAISO) region and interconnects to Southern California Edison (SCE) at the Colorado River 230 kV point of interconnection.
INVICTUS is listed in the CAISO interconnection queue as entry CAISO-2045, with an interconnection queue date of April 15, 2021. The project's proposed commercial operation date is November 26, 2029, and its interconnection status is currently in the System Impact Study phase. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
CA
County
Riverside
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
—
Point of Interconnection
Colorado River 230 kV
Data Source
LBNL + Live
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CRIMSN_7_CN3
- POI Substation
- Colorado River Substation